March-Baumgarten-Gasleitung (MAB)
Description
The MAB comprises a DN500 pipeline and auxiliary equipment.
Route
This pipeline system runs from the Austrian-Slovak border to Baumgarten an der March.
Length
2.5 km
Commissioned
1997
The MAB comprises a DN500 pipeline and auxiliary equipment.
This pipeline system runs from the Austrian-Slovak border to Baumgarten an der March.
2.5 km
1997