March-Baumgarten-Gasleitung (MAB)

Description

The MAB comprises a DN500 pipeline and auxiliary equipment.

Route

This pipeline system runs from the Austrian-Slovak border to Baumgarten an der March.

Length

2.5 km

Commissioned

1997