HU-SK-AT corridor

Gas Connect Austria conducts a binding allocation of capacity at the interconnection point Baumgarten (border Slovakia/Austria) and at the interconnection point Veľké Zlievce/Balassagyarmat (border Hungary/Slovakia) jointly with Slovak transmission system operator Eustream and Hungarian transmission system operator MGT.

Bidding window III had been opened from April 5, 2019 to April 17, 2019. No capacity has been allocated at the interconnection point Baumgarten.

Bidding window II had been opened from October 6, 2018 to October 19, 2018. At the interconnection point Baumgarten capacity has been allocated according to the below table: 

Gas yearkWh/h
2022/23891,667
2023/24890,667
2024/25890,667
2025/26890,667
2026/27890,667
2027/28890,667
2028/29890,667
2029/30417,667
2030/311,000
2031/321,000
2032/331,000
2033/341,000
2034/351,000
2035/361,000
2036/371,000

Allocations at the interconnection point Vel'ké Zlievce / Balassagyarmat (border Hungary / Slovakia) are published on the internet pages of Eustream and MGT respectively. 

A market consultation took place from May 25, 2018 until June 25, 2018. Find the consultation documents of Gas Connect Austria below.

Gas Connect Austria has received nine responses from market participants. Find below statements that have been authorised to be published by the respective market participants:

A shipper information event was held in the premises of the Hungarian regulatory authority on June 5, 2018. Find more information on the web pages of our project partner MGT!