Project description

Project Name

GCA Mosonmagyaróvár

 

 

Status

Planned

 

Description of project idea

The cross border point Mosonmagyaróvár connects the market of Austria and Hungary. The physical flow direction is currently going from Austria to Hungary. The project would ensure a reverse flow from Hungary to Austria. The project is at the moment in the conceptual phase and the current planning is based on market indications. This project would be a potential connection to other projects for the establishment of a Southern Corridor.

 

Non-binding Market Consultation I

To further the Southern Corridor GAS CONNECT AUSTRIA together with the Hungarian transmission system operator (TSO) FGSZ Zrt. and the Romanian TSO SNTGN Transgaz SA consider to jointly conduct an open season (OS) procedure for the booking of new or incremental cross-border transmission capacity at the Romanian-Hungarian border and the Hungarian-Austrian border.

The TSOs have consulted the market in a non-binding way on the possible capacity allocation methods to be applied in the OS procedure.

 

Any interested party was invited to send the consultation Response to the following e-mail address in the time period 03 Febrary 2016 - 22 February 2016 16:00 CET to the following E-Mail adress:

sales.transmission[@]gasconnect.at

 

Consultation Responses

Response 1

Response 2

Response 3

Response 4

Response 5


 

Non-binding Market Consultation II

Natural gas transmission system operator companies SNTGN Transgaz SA, FGSZ Zrt. and Gas Connect Austria GmbH consider to jointly conduct a binding open season for the booking of new or incremental cross-border transmission capacity at the Romanian-Hungarian border and the Hungarian-Austrian border. The preparatory process is supported by the respective national regulatory authorities, i.e. ANRE (Romania), HEA (Hungary) and E-Control (Austria).


The published document consists of the draft Open Season Rulebook and an example for the proposed capacity allocation methodology.


CONSULTATION DOCUMENT I - BINDING OPEN SEASON RULEBOOK

CONSULTATION DOCUMENT II - EXAMPLE


The TSOs have consulted the market in a non-binding way on the Open Season Rulebook to be applied in the OS procedure. All involved TSOs published the same documents on their websites. Any interested party was invited to send the consultation Response to the following e-mail address in the time period 11 November 2016 - 09 January 2017 16:00 CET to the following E-Mail adress: sales.transmission[@]gasconnect.at

 

 

 

ROHUAT Shipper Event on 08th March 2017 in Budapest


Agenda for the Shipper Event 8th March 2017

Registration form

Practical information

 

 

ROHUAT Binding Open Season Procedure


ROHUAT - Open Season Rule Book (Draft)

Annex 01 - Registration form (Draft)

Annex 02 - Bid form (Draft)

Annex 07 - Frame Capacity Contract

Annexes to the Frame Capacity Contract

Annex 08 - Capacity Contract ROHUAT Open Season Procedure (Draft)

Annex 09 - Model Bank Guarantee Security Deposit regarding Termination Fee (Draft)

 

Link to Contractual Framework of FGSZ Zrt.

Link to Contractual Framework of SNTGN Transgaz SA


 

Project Promoter

GAS CONNECT AUSTRIA GmbH, Department Sales Transmission